WHAT’S INCLUDED

Pre-Purchase/Vendor Building Inspections

Internal
  • Ceilings
  • Wall
  • Floors
  • Windows
  • Doors & Frames
  • Kitchen
  • Wet Areas including bathrooms, toilets and laundries
  • Rising moisture and salt damp
  • Waterproofing
  • Termite activity/pest activity
Structure
  • Timer and steel framing
  • Concrete structures including slabs
  • Load bearing walls
  • Lintels

 

Roofing
  • Roof cover
  • flashings
  • Skylights
  • Vents
  • Flues

 

External
  • External wall elements
  • Site drainage
  • Guttering
  • Downpipes
  • Eaves
  • Fascia and Barges
  • Chimneys
  • Stairs
  • Balconies
  • Verandas
  • Patios
  • Decks
  • Balustrades
  • Waterproofing
  • Termite/pest activity
  • Rising moisture/salt damp
  • Damp Proof Courses

 

Roof Space
  • Sarking
  • Party walls/Fire walls
  • Insulation
  • Downlight separation
Site
  • Fences
  • Pool fences
  • Landscaping
  • Retaining walls
  • Trees
  • Termite/pest activity
  • Sheds
  • Rain water tanks
  • Hot water Systems
  • Driveways
  • Out houses and separated building structures
  • External steps and balustrades

 

Sub Floor Space
  • Timber Floor supports
  • floor
  • ventilation
  • drainage
  • damp
  • Suspended Concrete Floors

Staged Building Inspections

Typically, Stage Building Inspections for New Builds consist of the following stages:

 

  1. Site Establishment and Setout
  • Ensure site has been prepared and setout to commence setout and excavation for underfloor services and concrete footings and slab.
  • Compliance in accordance to Australian Standard and Design documentation

 

  1. Concrete Slab and Underfloor Services including inspection of:
  • underfloor services
  • reinforcement, damp proof course
  • Termite barriers
  • Footing beams and slab design in accordance with engineer’s design
  • Condition/cleanliness of footings and slab prior to pour
  • Formwork

 

  1. Timber Wall and Roof Framing:
  • Compliance with engineer’s design
  • Compliance with Australian Standards
  • Compliance with Roof Framing Regulation 74 – Supervisor checklist

 

  1. External Wall and Roof Cladding:
  • Defective works
  • Compliance in accordance with relevant Australian Standards
  • Compliance in accordance with design documentations

 

  1. Internal Wall and Ceiling Linings:
  • Defective workmanship
  • Compliance in accordance with design docs
  • Compliance with manufactures recommendation
  • Compliance with Australian Standards

 

  1. Internal Wet Area Waterproofing:
  • Compliance with manufacture recommendations
  • Compliance with Australian Standards

 

  1. Internal Fit-Out Inspection:
  • Joinery
  • Painting
  • Floor covering
  • 2nd fix carpentry

 

  1. Pre-Handover Defect Inspection:
  • Defect inspection prior to release of final payment to builder